Park Road I-84 Project

What's New

Construction work continues between the existing on and off ramps. Traffic has been shifted on both the on and off-ramps and additional concrete barriers have been installed to separate traffic from the work zone. The Contractor has removed pavement from sections of the off-ramp and is preparing to place base material for the new off-ramp. The new off-ramp will be paved later this summer. On Park Road the contractor is continuing to install the new storm drainage system and new traffic signal control equipment. Park Road will have temporary lane closures and detours will be in place to maintain safe work areas. Motorists should expect delays and are advised to avoid the project area and seek alternate routes when possible. Check back often for more updates.

For a live look at the progress, please click the ‘Live Cam’ link on the menu bar on the left side of the screen.

Construction Live Cam provided by iBEAM Construction Cameras 

 By the Numbers
30,000 Average Vehicles Per Day 
17,300 Cubic Yards of Earth to be moved
13,700 Tons of Asphalt
7,500 New Sidewalk (in square feet)
400 Calendar Days to Complete the project
280 New Trees to be planted
41, 42 or 44 Alternate Highway Exits during Construction
$6.8 Million Project Cost
3 New Traffic Signals